|
Exam Code: 2V0-32.22
Exam Name: VMware Cloud Operations 8.x Professional
Language: English
Duration: 60 minutes
Number of Questions: 130
Passing Score: 300 (scaled)
Exam Fee: $250 USD
The VMware Cloud Operations 8.x Professional exam, designated as 2V0-32.22, is a
certification exam that validates your expertise in managing and operating
VMware cloud environments. Key details about the exam are as follows:
The exam covers various domains, including:
Architecture and Technologies: Understanding virtualization concepts, cloud
computing models, and VMware's architectural approaches.
Products and Solutions: Knowledge of VMware cloud products, their features, and
use cases.
Planning and Designing: Skills in assessing requirements and designing cloud
infrastructures.
Installing, Configuring, and Setup: Proficiency in installing and configuring
VMware cloud environments.
Performance-Tuning, Optimization, and Upgrades: Ability to perform performance
tuning, resource optimization, and upgrades.
Troubleshooting and Repairing: Competence in diagnosing and resolving common
issues.
Administrative and Operational Tasks: Expertise in routine management activities
and operational best practices.
For comprehensive preparation, it's recommended to review the official exam
guide and consider utilizing practice exams to assess your readiness.
For more detailed information, you can refer to the official VMware
certification page:
The 2V0-32.22 VMware Cloud Operations 8.x Professional exam focuses on
validating skills and knowledge in managing VMware Cloud solutions. Below are
the core topics typically covered in the exam:
1. Architecture and Technologies
- Understanding VMware's Cloud architecture.
- Concepts of virtualization, cloud computing models (IaaS, PaaS, SaaS).
- VMware Cloud Foundation and its components.
- VMware Cloud Director and NSX integration.
2. VMware Products and Solutions
- Features and functionalities of VMware Cloud solutions, including:
- VMware vRealize Suite (vRealize Automation, vRealize Operations, vRealize Log
Insight).
- VMware Cloud on AWS and other public cloud integrations.
- Licensing and deployment considerations.
3. Installation, Configuration, and Setup
- Installation of vRealize Automation and other VMware cloud tools.
- Configuration of environments to meet organizational requirements.
- Integration of cloud management tools with on-premises and public cloud
resources.
4. Planning and Designing
- Planning VMware cloud deployments to align with customer needs.
- Designing VMware Cloud environments for scalability and performance.
5. Performance Optimization and Upgrades
- Optimizing resources for workload performance and cost efficiency.
- Upgrading VMware Cloud components without downtime.
6. Troubleshooting and Problem Resolution
- Troubleshooting common issues within VMware Cloud environments.
- Diagnosing problems in vRealize Operations and Automation.
- Log analysis using VMware vRealize Log Insight.
7. Administrative and Operational Tasks
- Day-to-day operations and administration of VMware Cloud solutions.
- Implementing and maintaining security and compliance requirements.
- Resource allocation and monitoring.
Preparation Tips:
- Review the official exam guide from VMware.
- Explore VMware’s training courses, like:
- VMware Cloud Operations training.
- VMware Hands-on Labs for practical exposure.
- Practice using vRealize Suite and VMware Cloud services.
For more precise details, you can refer to the official VMware Certification
Exam Guide. Would you like help locating that guide or preparing study
materials?
2V0-32.22 Brain Dumps Exam + Online / Offline and Android Testing Engine & 4500+ other exams included
$50 - $25 (you save $25)
Buy Now
QUESTION 1
DRAG DROP
An administrator has been tasked with importing a new certificate for vRealize
Operations using
vRealize Lifecycle Manager.
Drag and drop the four correct actions the administrator must complete from the
action list on the
left and place the actions into the correct sequence on the right. (Choose
four.)
Answer:
Explanation:
To import a new certificate for vRealize Operations using vRealize Lifecycle
Manager (vRSLCM), the
correct sequence of actions is as follows:
Login as admin@local
In the My Services page, click Locker
In the Navigation pane, click Certificates
On the Certificates page, click Import
Login as admin@local:
The administrator must log in with administrative credentials to access vRSLCM's
services and settings.
In the My Services page, click Locker:
The "Locker" service in vRSLCM is used to manage certificates, credentials, and
licenses.
In the Navigation pane, click Certificates:
Once in the Locker service, navigate to the Certificates section to manage and
import SSL certificates.
On the Certificates page, click Import:
The final step is to click "Import" to upload the new certificate into vRSLCM.
Incorrect Steps:
Login as root@local: Root login is typically not required for vRSLCM operations.
In the Security page, click Locker: Locker is accessed through the My Services
page, not the Security page.
By following this sequence, the certificate import process will be completed
successfully.
QUESTION 2
Which three deployment architectures are valid for vRealize Log Insight
listed below? (Choose three.)
A. Ten node deployment with the integrated load balancer
B. Single node deployment with an external load balancer
C. Single node deployment with no load balancer
D. Three node deployment with an external load balancer
E. Single node deployment with the integrated load balancer
F. Two node deployment with the integrated load balancer
Answer: C, D, F
Explanation:
vRealize Log Insight offers flexible deployment architectures to suit various
needs.
Single node deployment with no load balancer : This is suitable for smaller
environments with
limited log volume. A single vRealize Log Insight node handles all log
management tasks.
Three node deployment with an external load balancer : This architecture
provides high availability
and scalability. An external load balancer distributes incoming traffic across
the nodes. This offers
flexibility in load balancer selection and configuration.
Clustered deployment with integrated load balancer : This architecture also
provides high availability
and scalability. In this configuration, a minimum of three vRealize Log Insight
nodes are deployed.
The integrated load balancer distributes incoming log traffic across the nodes,
preventing a single point of failure.
The following architectures are not valid for vRealize Log Insight:
Ten node deployment with the integrated load balancer: The maximum number of
nodes in a cluster
is limited, and ten nodes with an integrated load balancer is not a supported
configuration.
Single node deployment with an external load balancer: A single node deployment
does not require a load balancer.
Single node deployment with the integrated load balancer: The integrated load
balancer is designed
for clustered deployments with a minimum of three nodes.
Two node deployment with the integrated load balancer: The integrated load
balancer requires a
minimum of three nodes for cluster functionality.
QUESTION 3
Forty days ago, an administrator provisioned a Virtual Machine (vm-01) in
preparation for a new
project. The project has now been delayed due to budgetary constraints. As part
of the monthly
service management checks, a second administrator executes the reclaim action on
all idle virtual
machines and vm-01 is listed. The second administrator accidentally reclaims all
idle virtual machines including vm-01.
What action can the administrator complete to prevent this scenario from
happening again?
A. Create a dynamic group with membership based on vSphere tags so that all new
virtual machines are included and then exclude the entire group from reclaim
analysis.
B. Disable Capacity reclamation on the policy applied to new virtual machines.
C. Create a new policy that disables the capacity reclamation on the policy and
apply the policy to the parent object hosting new virtual machines.
D. Increase the default value of the Exclude VM provisioned in the last x days
setting.
Answer: D
Explanation:
Questions no: 3 Verified Answer = D Comprehensive Detailed Explanation with all
VMware Reference
= To prevent the accidental reclamation of recently provisioned VMs, the
administrator should
increase the default value of the "Exclude VM provisioned in the last x days"
setting. This setting
determines the period during which newly provisioned VMs are excluded from
reclamation analysis.
By increasing this value, the administrator can ensure that VMs provisioned for
new projects are not
inadvertently reclaimed .
Here's why the other options are not the best solution:
A . Create a dynamic group with membership based on vSphere tags so that all new
virtual machines
are included and then exclude the entire group from reclaim analysis. While this
approach can be
effective, it requires additional configuration and management of dynamic groups
and vSphere tags.
Increasing the "Exclude VM provisioned in the last x days" setting is a simpler
and more direct solution.
B . Disable Capacity reclamation on the policy applied to new virtual machines.
Disabling capacity
reclamation entirely would prevent vRealize Operations from identifying and
reclaiming any idle
resources on those VMs, which may not be desirable.
C . Create a new policy that disables the capacity reclamation on the policy and
apply the policy to
the parent object hosting new virtual machines. Similar to option B, this would
disable capacity
reclamation for all VMs under the parent object, which may be too broad and
prevent the
reclamation of other idle resources.
QUESTION 4
An administrator needs to deploy a 3-node High Availability duster of
vRealize Operations using
custom CA-signed certificates. An existing vRealize Operations development
environment has
previously been deployed using vRealize Suite Lifecycle Manager
Which method should the Administrator use to complete this objective?
A. Deploy 3 nodes independently, replace certificates and then form the 3-node
duster
B. Deploy a single node duster at the beginning to further expand it to 3 nodes
m the next step.
C. Deploy vRealize Operations analytics duster using Command Line Interface.
D. Deploy vRealize Operations analytics duster using vRealize Suite Lifecycle
Manager.
Answer: D
Explanation:
The administrator should deploy the vRealize Operations analytics cluster using
vRealize Suite
Lifecycle Manager (vRSLCM) . vRSLCM simplifies the deployment and management of
vRealize Suite
products, including vRealize Operations. It allows the administrator to deploy a
3-node High
Availability cluster with custom CA-signed certificates in a streamlined manner.
Here's why the other options are not suitable:
A . Deploy 3 nodes independently, replace certificates and then form the 3-node
cluster: This
approach is more complex and prone to errors. It involves manual configuration
and certificate
replacement on each node.
B . Deploy a single node cluster at the beginning to further expand it to 3
nodes in the next step:
While possible, this method is not as efficient as deploying a 3-node cluster
directly using vRSLCM.
C . Deploy vRealize Operations analytics cluster using Command Line Interface:
Deploying using the
CLI requires more expertise and manual intervention compared to using vRSLCM.
vRSLCM provides a centralized platform for managing the entire lifecycle of
vRealize Suite products,
including deployment, configuration, and upgrades. It simplifies the process of
deploying a 3-node
High Availability cluster of vRealize Operations with custom CA-signed
certificates, ensuring a secure
and efficient deployment.
QUESTION 5
In vRealize Operations, a user applies a CPU License to a custom group which has
existing hosts.
How will the Virtual Machines (VMs) on the existing hosts be affected?
A. The CPU license gets converted to a CPU and VM license.
B. The VMs running on the hosts show a 'License is Invalid* watermark.
C. The VMs running on the hosts are not affected.
D. vRealize Operations prompts the user to apply a VM license key to the VMs
running.
Answer: B
Explanation:
When a CPU license is applied to a custom group containing existing hosts in
vRealize Operations, the
VMs running on those hosts will show a "License is Invalid" watermark . This is
because CPU licenses
in vRealize Operations are specifically designed for licensing hosts and their
CPU capacity. To license
the VMs running on those hosts, you need to apply a separate VM license key.
Here's why the other options are incorrect:
A . The CPU license gets converted to a CPU and VM license: vRealize Operations
does not
automatically convert CPU licenses to VM licenses.
C . The VMs running on the hosts are not affected: This is incorrect, as the VMs
will be affected by the
lack of a valid VM license.
D . vRealize Operations prompts the user to apply a VM license key to the VMs
running: While
vRealize Operations may indicate that the VMs are not properly licensed, it does
not explicitly
prompt the user to apply a VM license key.
QUESTION 6
When using vRealize Lifecycle Manager to capture content from a vRealize
Operations endpoint,
which three statements are correct regarding the content sync? (Choose three.)
A. An auto refresh of content list runs in the background every 15 minutes.
B. The UI retrieves the content every time from the endpoint when opening the
endpoint.
C. An auto refresh of content list runs in the background every 30 minutes.
D. The UI retrieves the content from the endpoint when listing the content for
the first time.
E. Select the "Get latest" content option to retrieve the content in between
automatic sync timers.
F. Select the "Get latest" content option to retrieve the content, before the
initial sync.
Answer: A, D, E
Explanation:
When capturing content from a vRealize Operations endpoint in vRealize Lifecycle
Manager, the
following statements are correct regarding content sync:
A . An auto refresh of content list runs in the background every 15 minutes :
vRealize Lifecycle
Manager automatically refreshes the content list in the background every 15
minutes to ensure that
the displayed content is up-to-date.
Certainly, here's a rewritten version of your text:
Packiam Vijendran 1 months ago - Malaysia
Passed the exam yesterday, 95% of the question were from this site. Note: Pay
more attention to all the community discussions on each question, instead of the
answers provided by the examtopics and I strongly suggest to get the contributor
access.
upvoted 4 times
Javier Cardaba Enjuto 2 months, 1 week ago - Spain
Excellent pre-exam session tool
upvoted 2 times
Palanisamy Arulmohan 1 months, 1 week ago - USA
I passed today, 94 questions asked and 99% of them were in this dump.
3 labs: BGP (as-override), HSRP, OSPF (without network statement)
upvoted 4 times
peppinauz 3 months, 2 weeks ago
I pass my exam, dump is valid about 90-95%. review the community answers!!
upvoted 6 times
Oberoi Ankit3 months, 3 weeks ago - USA Texas
Passed exam today dump still accurate. almost all the questions are here, some
are overcomplicated or incomplete on the site,
upvoted 4 times