|
Earn associated certifications
Passing this exam is required to earn these certifications. Select each
certification title below to view full requirements.
Oracle Utilities Meter Solution Cloud Service 2022 Certified Implementation
Professional
Format: Multiple Choice
Duration: 90 Minutes
Number of Questions: 55
Passing Score: 70%
Validation: This exam has been validated against Oracle Utilities Customer Cloud
Service 22A and 22B
Policy: Cloud Recertification
Prepare to pass exam: 1Z0-1091-22
An Oracle Utilities Meter Solution Cloud Service 2022 Implementation
Professional has demonstrated the knowledge required to implement and configure
the service; including Service Points, Devices, Measuring Components, Usage
Subscriptions, and Usage Calculation Rules. They can set up Dynamic
Aggregations, integrate with customer information systems (CIS), and configure
the Smart Grid Gateway (SGG) SaaS Architecture.
Review exam topics
Service Points, Devices and Measuring Components
Explain key concepts Service Points, Devices and Measuring Components
Configure Service Points, Devices and Measuring Components and Measurement
Cycles
Measurements
Describe and implement intial measurements, final measurements, and derrived
values
Describe Measurement Reprocessing functionality and Substractive Interval Data
Implement Best practices for measurement retention
Map Interval Measurements To Time-of-Use Periods
Explain the key concepts of Time-of-Use (TOU) and how it applies to final
measurements
Configure work calendars
Generate TOU map data and check for correctness
VEE: Validation, Estimation and Editing
Explain VEE rules and exceptions
Configure VEE rules and exceptions, including the VEE rules used by the
consumption synchronization process
Configure Advanced Estimations
Usage Subscriptions
Explain usage subscriptions
Design and set up the admin data required to effectively configure a usage
subscription
Usage Calculation Groups / Rules and Usage Transactions
Explain Usage Calculation Groups / Rules and Usage Transactions
Configure base package usage calculation rules
Configure dynamic rate determination
Configure eligibility criteria for Usage Rules
Configure the Usage Rule - Math usage rule to perform mathematical operations on
service quantities
Configure a Dynamic Option Type
Dynamic Aggregations
Explain the main components of Dynamic Aggregations
Set up and understand Dynamic Aggregations
Integrations
Describe DataConnect
Integrate with Customer Information Systems
Smart Grid Gateway (SGG) SaaS Overview, Adapters and Integrations
Describe Smart Grid Gateway (SGG) SaaS
Configure the Smart Grid Gateway (SGG) SaaS Architecture
Smart Grid Gateway (SGG) SaaS Payload Processing
Describe Usage and Event Upload
Explain the cloud service payload processing configuration
Device Events
Configure Standard Event Names
Configure Device Events to support filtering of momentary outage events
Smart Grid Gateway (SGG) SaaS Command Processing
Configure Head-End Systems
Describe the commands generally supported by SGG adapters and the Adapter
Development Kit (ADK)
Set up and configure commands
Service Order Management
Describe Service Order Management and Service Investigative Orders
Configure Service Order Activities
Configure Service Investigative Orders
Operational Device Management
Explain the role of assets and components
Configure specifications and their relationship to assets
1Z0-1091-22 Brain Dumps Exam + Online / Offline and Android Testing Engine & 4500+ other exams included
$50 - $25 (you save $25)
Buy Now
QUESTION 1
A business needs a new Service Order process that includes meter commands. Which
THREE options should you configure to build this process?
A. Measuring component type
B. Device configuration type
C. Activity type
D. Communication type Message sender
Answer: ACD
To build a new Service Order process that includes meter commands, you need to
configure the following options:
Measuring component type: This defines the type of measurement that a device can
record, such as
scalar, interval, or event. You can associate meter commands with measuring
component types to
perform actions on devices that have those types1.
Activity type: This defines the type of work that needs to be performed on a
service point or device,
such as installation, removal, or inspection. You can associate meter commands
with activity types to
trigger actions on devices when an activity is completed1.
Communication type Message sender: This defines the communication channel and
protocol that is
used to send meter commands to devices. You can configure message senders for
different
communication types, such as AMI, AMR, or manual1.
You do not need to configure device configuration type, which defines the
physical characteristics
and attributes of a device, such as manufacturer, model, or serial number1.
Device configuration
type does not affect meter commands.
Reference: 1: Oracle Utilities Meter Solution Cloud Service - Business User
Guide - Chapter 4:
Configuring Meter Solution Cloud Service
QUESTION 2
In the SaaS solution, how should you configure equipment that attaches to an
asset, such as a communication module attached to a meter?
A. Set up a component
B. Create a master child asset
C. Add a sub-asset
D. Add a constituent part
Answer: A
To configure equipment that attaches to an asset, such as a communication module
attached to a
meter, you should set up a component. A component is a part of an asset that can
be installed and
removed independently of the asset. You can define component types and associate
them with asset
types. For example, you can define a communication module component type and
associate it with a meter asset type2.
You do not need to create a master child asset, which is a relationship between
two assets that are
installed at different service points but are functionally related. For example,
you can define a
transformer as a master asset and a meter as a child asset2. A master child
asset is not suitable for
equipment that attaches to an asset.
You do not need to add a sub-asset, which is an asset that is installed at the
same service point as
another asset but has its own measuring components and usage subscriptions. For
example, you can
define a meter as a sub-asset of another meter if they share the same service
point but have
different measurements2. A sub-asset is not suitable for equipment that attaches
to an asset.
You do not need to add a constituent part, which is an attribute of an asset
that cannot be installed
or removed independently of the asset. For example, you can define a battery as
a constituent part
of a meter if it is embedded in the meter and cannot be replaced2. A constituent
part is not suitable
for equipment that attaches to an asset.
Reference: 2: Oracle Utilities Meter Solution Cloud Service - Business User
Guide - Chapter 5: Managing Assets
QUESTION 3
3. For a Meter Data Management (MDM) implementation, customer information
system (CIS) requires the following bill determinants:
For scalar meters, scalar consumption values will be sent to CIS.
For interval meters, billed on time-of-use (TOU) rates, consumption values will
be provided based
on the specific TOU periods, for example: on-peak, off-peak, and shoulder.
Based on these requirements, which TWO usage subscription or usage calculation
group
configuration options should you set up to allow an implementation to send bill
determinants to CIS?
A. Scalar specific group as a fallback Validation, Estimation, and Editing (VEE)
group.
B. TOU usage group as a fallback VEE group.
C. Scalar usage calculation rule with a valid usage group.
D. TOU usage rule with a valid usage group.
Answer: C
To allow an implementation to send bill determinants to CIS based on the
requirements, you should
set up the following usage subscription or usage calculation group configuration
options:
Scalar usage calculation rule with a valid usage group: This defines how scalar
consumption values
are calculated from measurements and sent to CIS. You can define scalar usage
calculation rules for
different measurement types and associate them with usage groups. A usage group
is a collection of
usage calculation rules that are applied to measurements based on certain
criteria3.
TOU usage rule with a valid usage group: This defines how TOU consumption values
are calculated
Jsaon
I always enjoy Scott Duffy training videos. I like how this followed the skills
outline from Oracle.
It was a great course which helped me to clear 1Z0-1091-22, I had previous experience
in QnA Maker and Bot services but other major areas are very well covered by
Scott. In the practice test I scored 70% in the first attempt.. but it gave
proper understanding and logic building thrust.
Jessica
This course is a great walkthrough Azure Cognitive Services, but definitely not
prep material for 1Z0-1091-22 exam.
Scott: cleard my exam in one week
Despite being recently updated this course feels out of date, for example there
are 31 minutes of videos on QnA maker, but this service does not appear on the
current study guide and its not clear from the course content how this differs
from its replacement (Azure Cognitive Service for Language).
Furthermore, 10 minutes of videos on knowledge mining feels low for an area that
makes up 15-20% of the exam
Richel
I have cleared exam today with 900!, these mock tests were very helpful to me
and highly recommended. Thank you
David
Successfully cleared 1Z0-1091-22 exam today with 960 marks. All the questions similar
and came from this Mock tests. Thanks a lot certkingdom.
Hillary - CANADA
Oct 26, 2022
Rating: 4.3 / 5.0
I studied and pass my exams using cerkingdom material carefully and took every
question seriously. At last, I passed the exam with high score. Prepare well and
study much more.